Workers from above
Aerial view of construction workers on the FDR Drive
Kak Channthy
Kak Channthy performs with Cambodian Space Project at Pianos
Bridge removal
The remains of the Delancey Street footbridge are loaded onto a flatbed
Assembled bridge
Completed Delancey Street footbridge at Corlears Hook
Esplanade
Construction workers stand on a partially-constructed esplanade in East River Park
Lifting straps
Preparing to lift the Delancey Street bridge into place
Flowering trees
Flowering cherry trees in Corlears Hook Park
Flooding
A bucket loader drives through standing water after a rainstorm
Ready to move
Delancey Street bridge on modular transporters
Amphitheater area
Site of the former East River Park Amphitheater after demolition
Flying bridge
Cranes lift the Delancey Street footbridge into place
Broken benches
East River Park after demolition of the amphitheater